Electric hoist gantry crane Completion Acceptance

Equipment factory, the factory in accordance with professional standards crane "JB1306-2008 crane technical conditions" and "JB/T5663.1 -2008 electric  hoist gantry crane  Types and basic parameters" "JB/T5663.2-2008 electric hoist gantry crane technical conditions ", a series of quality checks and running test (depending on the device at the factory as part of the conditions of the test or the entire organization crane test), that qualified and granted a certificate of compliance.
To ensure that the use of units installed last  eot crane ,  erected to meet the requirements, and use of the formal use of the crane before, based upon the relevant provisions of the first running test.
After the test run, the installation unit should hand over the crane handling procedures, hand over the acceptance documentation shall include:
A crane operation test record sheets (with attachments).
2, cranes hand over a single (with attachments).
3,  jib crane  production certificate (with attachments).

      Crane operation test record sheets, installation and use of units should be armed with one, if the machine is defective, whether or not being repaired, shall be registered in the record list, as the original basis.