"Large crane install security monitoring and management system implementation plan" ( 2 )

Fourth, the main work steps and content

( A ) organizing the investigation , find out the base . First half of 2011 by the State Administration of Quality Supervision Organization in the provincial quality supervision department of a large  bridge gantry crane  with a survey has been conducted to find out the number with a large crane , security monitoring devices or systems , as well as large-scale lifting machinery manufacturing and so on.

( Two ) to carry out preliminary pilot , explore the experience . To the end of the first half of 2011 , select some key sectors ( areas ) of some key equipment to carry out preliminary pilot , demonstration and standards for the trial to provide basic data and experience.

1 . Preliminary scope of the pilot : first in railway construction , road construction , power station construction, and shipbuilding industries using more than 200 tons and erecting machine ,eot crane 200 tons and above universal gantry cranes, 320 tons and above, shipbuilding gantry cranes, 60 tons and above ports , shipyards , power plants and portal cranes , 2000 t m and above normal , power tower cranes, crawler cranes 450 tons and above , fixed , swing -style, pan , Radiant cranes of thirteen varieties pilot.

2 . Pilot Contents: quality supervision department in conjunction with the safety supervision department and other relevant departments on the production and use of the identified units of each selection 1-2 sets new manufacturing and 1-2 sets in with a large crane , installed on one machine safety monitoring and management system , By monitoring , control, management and other means , to achieve safe operation control , dangerous critical alarm , on-site real-time display and data record keeping and other functions, while the use of video and audio technology to achieve real-time display and recording status , after the playback effect. On this basis , in conditional units work according to the specific circumstances and needs , and further remote transmission, remote monitoring, remote management, remote services, data , video and audio queries, data, video and audio statistics and analysis functions gradually build things based technologies crane safety monitoring and management of local and remote monitoring platform monitoring platform [WY1].

( Three ) the development of standards , test verification . First half of 2011 to the end of the relevant standard committee coordinating organization for scientific research, design , manufacture, use , inspection , and other units to develop and report security monitoring and management system with national standards. Meanwhile, the combination of pre- trial , organizations related to type testing agencies already "  hoist gantry crane  safety monitoring and management system " to carry out experimental verification.

( Four ) consolidate our achievements , to expand the pilot . 2012-2013 , summed preliminary experimental work, expand the scope .

1.2012 , the pair of large lifting machinery, production and use of all units in the unit at least one corresponding to each species of large crane install security monitoring and management system , consolidate and promote the early experimental results.

2.2013 years , and gradually in all newly manufactured large lifting machinery installed all security monitoring and management system .

( Five ) full forward, to achieve tangible results . 2014 to 2015 , and intensified efforts , the full implementation of this work to achieve standardization, normalization .

1 . Starting in 2014 , all in a large crane with a full installation on security monitoring and management system .

2.2015 at the end , have not installed security monitoring and management system of large lifting machinery, will not be used.

Fifth, work requirements

( A ) to strengthen their leadership and responsibility . Local quality supervision , safety supervision and relevant departments should strengthen leadership , and assign responsibilities . Local quality supervision departments to combine the actual situation, formulate practical program of work to strengthen coordination and cooperation with relevant departments , while strengthening the help of pilot enterprises , supervision and guidance of research to develop the necessary incentive and restraint measures , a strong impetus to this term work.

( Two ) focused and strengthened. Local quality supervision , safety supervision and relevant departments to guide and supervise the production and use units to develop security monitoring and management system procedures, enhance operator training, improve skills , standardized field use management, and improving the level of protection and security infrastructure 's ability to prevent accidents , in accordance with the requirements of stage work , timely completion of large lifting machinery installed security monitoring and management system tasks.

( Three ) to strengthen the linkage , and strengthen supervision . Local quality supervision , safety supervision departments should unite and collaborate closely with , and vigorously promote the orderly conduct of this work . To actively seek relevant policies to encourage the production and use of units to strengthen the monitoring of daily supervision , to take inspection, sampling inspection, mutual inspection , etc., on a large  hoist crane  mounted security monitoring and management system were carried out step by step inspection, identify problems and timely coordination solution . To work around promptly reported to the State Administration of Quality Supervision and the State Administration of Work Safety . AQSIQ and the State Administration of Work Safety will be based on the progress of work with the relevant departments to conduct supervision and inspection.

( Four ) wide publicity to create atmosphere . Local quality supervision , safety supervision departments should strengthen the publicity work in various forms , improve production , and use of , and management , engineering and technical personnel and knowledge of the workers , and fully mobilize their enthusiasm ; want to play to industry associations, societies, research institutes , inspection agencies in technology promotion and other aspects of the service , and improve the quality of work and level ; in the implementation process , pay attention to summing up the work , promotion of advanced models , demonstration and guidance , to promote the work for the orderly conduct of good work to form a good atmosphere.