Gantry crane run-in period of use and maintenance

Gantry crane factory, the general requirement of 60 hours of run-in period (some called a walk-in period), which is under the crane manufacturing plant technical characteristics of the initial requirements. Run-in period is to ensure the normal operation of gantry crane  and reduce the failure rate and prolong its service life the important part. But now, some users due to lack of gantry cranes to use common sense or because of a tight schedule, or would like to benefit as soon as possible, while ignoring new machine running for the special technical requirements. Some users even believe, anyway, has a bag factory warranty period, the machine is broken by the manufacturers responsible for maintenance, so the machine run-in period of prolonged overload, cause the machine to early failure occurs frequently, Lu prompted new  eot crane  manufacturers, which not only affect the normal use of the machine and shorten the life of the machine, but also because the machine is damaged, affecting the progress of the project. Therefore, the crane run-in period of use and maintenance should be given sufficient attention.


Gantry crane run-in period of use and maintenance

Since gantry  hoist crane  is a special equipment and vehicles, the operator should accept the manufacturer's training, guidance, the machine structure, properties have a full understanding and get some experience in the operation and maintenance before operating the machine.

没有评论:

发表评论