santo gantry crane

2013年7月29日星期一

Gantry crane beam pulley installation instructions

   Electric  hoist gantry crane  beam pulley power series led closing argument by the pulley, cable pulley, terminal tackle three parts, mechanical traction pulley moves with fairlead (traction) devices, each equipped with a mobile machinery, with the moving machinery from operation. Intermediate cable pulley hanging in the cable within the I-beam track with the traction pulley moves, and ends with the buffer hit head pulley may be different depending on the length of the number of moves. I-beam rail terminal block fixed at the end of each mobile machinery generally set one. Tractor for the cable head-end, the terminal is a fixed hanging wire frame, the middle of the cable pulley, the series tackles points Ⅰ, Ⅱ, Ⅲ, Ⅳ, Ⅴ five models.

    Electric hoist  gantry crane  beam pulley installation instructions:
    1, the fixed frame hanging wire installed, should be hung behind a baffle.
    2, adjust the traction head so that the car in the whole trip up and down the hole without touching the edge of traction as well.
    3, the cable length is 1.2 crane span doubly 8 m.
    4, adjust the traction electric hoist gantry crane rope to the same section of the cable length is less than the length of run time by the traction rope force.
    5, when the cable diameter range, the cable clamp should be between a soft rubber pads to the same diameter, so that the cable clamp.
    6, cloth cable, the cable should consider both sides of the pallet force balance.
    7, when the cable pulley is two, three, require the same.
    8, electric hoist  gantry crane  pulley device for the adjustment of the double washer washer, when rail unsuitable, the washer on the inside of the fixed plate to adjust the width of the gauge. Non-standard pulley manufacture according to the drawings.

没有评论:

发表评论