santo gantry crane

显示标签为“eot crane”的博文。显示所有博文
显示标签为“eot crane”的博文。显示所有博文

2014年1月23日星期四

Bridge ( door ) cranes

Currently, the crane must be tested by using the register be put into use after passing . During the inspection the bridge ( the door ) cranes , the main beam and the amount of camber main bridge gantry crane beam deflection measurement set is an indispensable element . Main beam camber measurement method , mainly water level measurements , pull wire ( Amendment) Act and laser straight line method measured deflection mainly theodolite , laser range finder , etc. ; due to different inspectors for camber and understanding different deflection , although the same measurement method , measurement point but full of tricks, with mixed results . Not standardized measurement method , camber and deflection values ??measured on the test and determine whether the crane girder qualified meaningless. In order to eot crane measure the value of camber and deflection can truly reflect the bridge ( the door) as an indicator crane girder situation , we must design intent , analyze measurement and evaluation standards . The purpose of the bridge and making the definition of a camber camber and deflection ( door ) crane main beam camber (F) is the main beam prefabricated by the horizontal line , counting the amount of upward arch . Deflection refers to the rated load in the main beam under the car , the elastic deformation of the main beam generated span down counting from the actual position of the front loading .

2013年12月1日星期日

According to the bridge approach is divided into bearing type and suspension type two kinds

According to the bridge approach is divided into bearing type and suspension type two kinds. The former bridge along the car on the beam of crane orbit; The bridge along the hanging in the workshop crane orbit under the roof. Single girder overhead gantry crane crane, electric two break up. Manual single-beam bridge crane institutions working speed is low, the weight is small, but its quality is small, easy to organize production, low cost, suitable for no power after carrying amount is not big, requirements for speed eot craneproductivity is not high. Manual single-beam bridge crane using manual monorailey troll as a running car, with the hand chain hoist as lifting mechanism, the bridge is made up of main girder and end beam. Main girder with single beams, beam with steel or bending molding steel plate welded.

2013年9月8日星期日

The market for the development of electric crane hoisted What?

Nowadays there are many products on the market is relatively good, because every product on the market developments are relatively hard, and more efforts to develop products on the market the more attractive, so its production the process of the electric overhead traveling  hoist crane  is more optimistic, and now on the market for electric overhead crane is more concerned about the development, and even some of the machinery is quite confident of its business, and I hope it is getting better and better development, so now on the market for its analysis of the development of electric crane hoisted What are the main?
1 Talent
Today, when the manufacturers in their production of electric overhead crane when the most important thing is to rely on the power of talent condensed because of the strength of cohesion is relatively large, a development of enterprises in the process of talent is the most need to have the If no talent then the company or the manufacturer of the product is difficult to produce, which explains professionals or the use of an electric hoist gantry crane , but in the selection process of the professionals is the need cautious.
(2) Equipment
When the electric overhead traveling crane manufacturers in the process of its production equipment is often more crucial thing, because electric crane hoisted on the market is a kind of relatively easy to use products, so for the time of its production equipment is relatively there is a demand.
This is the market for the development of electric  eot crane  hoisted the approximate analysis done.

2013年9月6日星期五

What materials commonly used cranes

What materials commonly used cranes?  bridge gantry crane  structural parts, metal structures, fittings and accessories are made ​​of metal and non-metallic materials processing.Crane parts generally forgings, rolled parts, welding parts, castings as blanks, after mechanical processing. Forgings, rolled parts, welding parts mainly carbon structural steel, quality carbon structural steel and low-alloy structural steels. Important parts are made of steel, steel structure together with the special requirements of special premiums steel parts. Castings can cast steel, cast iron and bronze. In order to improve the mechanical properties, single girder bridge cranes improved load carrying capacity and life of parts, the casting must be heat treated. Nonferrous metals and alloys are used with high electrical conductivity, wear resistance, corrosion resistance, or other special properties of high strength requirements of the parts

2013年8月30日星期五

How to extend the life of lifting equipment?

(A) to complete the task well: To achieve efficient, high quality, low cost;
   (2) good technical condition: overhead gantry crane To do mechanical devices are often in good condition, to achieve the specified performance requirements, random tools components and accessory devices such as a complete range;
   (3) Use good: To earnestly implement the responsibility system based on position of the system, bridge gantry craneso that rational use of original records should be complete and accurate;
   (4) maintenance of good: To conscientiously implement the maintenance of order, so meticulously maintained, ready to do a good job cleaning, lubrication, adjustment, tighten, corrosion;
   (5) Safety is good: to conscientiously comply with the relevant safety procedures and safety systems, to achieve safety, no mechanical accidents.
   As long as arouse people's enthusiasm, establish reasonable rules and regulations, strict implementation of technical requirements, will be able to improve  eot crane  intact rate of utilization and efficiency

Crane Operation Safety Regulations

One,  bridge gantry crane  driver and signalman shall have a unified signal. Operators should be dedicated ladder, operating room, closing should be preceded by the controller to zero. Operating room should be wood or rubber insulating mat board.
Second, the gantry crane work, should make the following preparations:
1, check the steel parts are securely connected.
2, check the volume of the rotating part of the field of machine lubrication is good, brakes are sensitive and reliable.
3, check the wiring is correct electrical equipment, insulation is good.
4, Check and test the limit switch is sensitive, good lighting equipment is complete.
5, check the scaffold boards, railings, escalators is in compliance with safety requirements.eot crane Rail clamp (or anchor screws) are tightened.
6, after two tripod legs pin and card board is moving.
7, room and operating room fire-fighting equipment are complete and valid.
Third, the driver must be located in the operating room good view position.
Fourth, the crane hoist, luffing, slewing used winches, winch must meet safety requirements, running the motor with the motor must comply with the relevant safety regulations, overhead gantry crane  wire rope used must meet the relevant safety requirements.
Fifth, check before driving on track to be within the scope of the ground and run unattended or obstacles, and-ringing hands. Traveling carts must have someone pull the cable, the cable car back and forth to be insulated well hung, sliding freely. When lifting, should be carried empty running, then try hanging from the ground 100-150mm, heavy bondage found incorrect, should be re-tied.

2013年8月29日星期四

"Large crane install security monitoring and management system implementation plan" ( 2 )

Fourth, the main work steps and content

( A ) organizing the investigation , find out the base . First half of 2011 by the State Administration of Quality Supervision Organization in the provincial quality supervision department of a large  bridge gantry crane  with a survey has been conducted to find out the number with a large crane , security monitoring devices or systems , as well as large-scale lifting machinery manufacturing and so on.

( Two ) to carry out preliminary pilot , explore the experience . To the end of the first half of 2011 , select some key sectors ( areas ) of some key equipment to carry out preliminary pilot , demonstration and standards for the trial to provide basic data and experience.

1 . Preliminary scope of the pilot : first in railway construction , road construction , power station construction, and shipbuilding industries using more than 200 tons and erecting machine ,eot crane 200 tons and above universal gantry cranes, 320 tons and above, shipbuilding gantry cranes, 60 tons and above ports , shipyards , power plants and portal cranes , 2000 t m and above normal , power tower cranes, crawler cranes 450 tons and above , fixed , swing -style, pan , Radiant cranes of thirteen varieties pilot.

2 . Pilot Contents: quality supervision department in conjunction with the safety supervision department and other relevant departments on the production and use of the identified units of each selection 1-2 sets new manufacturing and 1-2 sets in with a large crane , installed on one machine safety monitoring and management system , By monitoring , control, management and other means , to achieve safe operation control , dangerous critical alarm , on-site real-time display and data record keeping and other functions, while the use of video and audio technology to achieve real-time display and recording status , after the playback effect. On this basis , in conditional units work according to the specific circumstances and needs , and further remote transmission, remote monitoring, remote management, remote services, data , video and audio queries, data, video and audio statistics and analysis functions gradually build things based technologies crane safety monitoring and management of local and remote monitoring platform monitoring platform [WY1].

( Three ) the development of standards , test verification . First half of 2011 to the end of the relevant standard committee coordinating organization for scientific research, design , manufacture, use , inspection , and other units to develop and report security monitoring and management system with national standards. Meanwhile, the combination of pre- trial , organizations related to type testing agencies already "  hoist gantry crane  safety monitoring and management system " to carry out experimental verification.

( Four ) consolidate our achievements , to expand the pilot . 2012-2013 , summed preliminary experimental work, expand the scope .

1.2012 , the pair of large lifting machinery, production and use of all units in the unit at least one corresponding to each species of large crane install security monitoring and management system , consolidate and promote the early experimental results.

2.2013 years , and gradually in all newly manufactured large lifting machinery installed all security monitoring and management system .

( Five ) full forward, to achieve tangible results . 2014 to 2015 , and intensified efforts , the full implementation of this work to achieve standardization, normalization .

1 . Starting in 2014 , all in a large crane with a full installation on security monitoring and management system .

2.2015 at the end , have not installed security monitoring and management system of large lifting machinery, will not be used.

Fifth, work requirements

( A ) to strengthen their leadership and responsibility . Local quality supervision , safety supervision and relevant departments should strengthen leadership , and assign responsibilities . Local quality supervision departments to combine the actual situation, formulate practical program of work to strengthen coordination and cooperation with relevant departments , while strengthening the help of pilot enterprises , supervision and guidance of research to develop the necessary incentive and restraint measures , a strong impetus to this term work.

( Two ) focused and strengthened. Local quality supervision , safety supervision and relevant departments to guide and supervise the production and use units to develop security monitoring and management system procedures, enhance operator training, improve skills , standardized field use management, and improving the level of protection and security infrastructure 's ability to prevent accidents , in accordance with the requirements of stage work , timely completion of large lifting machinery installed security monitoring and management system tasks.

( Three ) to strengthen the linkage , and strengthen supervision . Local quality supervision , safety supervision departments should unite and collaborate closely with , and vigorously promote the orderly conduct of this work . To actively seek relevant policies to encourage the production and use of units to strengthen the monitoring of daily supervision , to take inspection, sampling inspection, mutual inspection , etc., on a large  hoist crane  mounted security monitoring and management system were carried out step by step inspection, identify problems and timely coordination solution . To work around promptly reported to the State Administration of Quality Supervision and the State Administration of Work Safety . AQSIQ and the State Administration of Work Safety will be based on the progress of work with the relevant departments to conduct supervision and inspection.

( Four ) wide publicity to create atmosphere . Local quality supervision , safety supervision departments should strengthen the publicity work in various forms , improve production , and use of , and management , engineering and technical personnel and knowledge of the workers , and fully mobilize their enthusiasm ; want to play to industry associations, societies, research institutes , inspection agencies in technology promotion and other aspects of the service , and improve the quality of work and level ; in the implementation process , pay attention to summing up the work , promotion of advanced models , demonstration and guidance , to promote the work for the orderly conduct of good work to form a good atmosphere.

2013年8月28日星期三

Light and small lifting equipment sales continued to grow business electricity suppliers need to follow up the pace

2013 January to April, China's small light lifting equipment production and sales continued to grow, as the second half of the small light  eot crane  industry development has brought good news, leaving small small light lifting equipment business development firm belief electricity supplier , the pace of business electricity supplier in constant follow-up.

Small lifting equipment future development of good corporate electricity providers follow the pace

In recent years, small light lifting equipment in the domestic market, more and more attention. Especially jacks, pneumatic hoists, winches and other light small lifting equipment has been rapid development, local small and medium enterprises small light lifting equipment sprung out of a thriving scene.

The data show that the first quarter of 2013, China's small light lifting equipment industry, industrial output value reached 10.733 billion yuan, an increase of 14.98%; industrial sales output value of 10.537 billion yuan, an increase of 14.73%. In addition, our small light  bridge gantry crane  industry, total imports and exports 775 million U.S. dollars, an increase of 9.09%. Among them, exports 557 million U.S. dollars, an increase of 15.45 percent, and imports $ 218 million, an increase of -4.36%.

These figures are the same as the booster, light lifting equipment companies to bring relief. But who would have thought that in 2012, small and medium enterprises have small light lifting equipment faced marketing problems.

Small light lifting equipment such as a traditional business, because such a large crane to attach lifting equipment, so the sales target and channel is very narrow, even only as an accessory heavy industries do not have their own innovative technology and broad market . Low-profit products, no market competition, companies always face closure.

After all, the traditional single marketing channel has been unable to meet the fierce competitive market, small  overhead gantry crane  companies need to find a platform for their own electricity supplier. Enterprise Development electricity supplier is not impossible, find a way to enter the field of electronic commerce is the most important.

Analysis expected in the next 10 years, the small light lifting equipment industry developed well, the market is a large space, network marketing will become a major way.

Large crawler crane lifting nuclear power plant dome

Japan's Fukushima nuclear accident in a certain range stirred public confidence in the safety of nuclear power, led to the development of nuclear energy world profound reflection, more than two years,overhead gantry crane countries more objective understanding of nuclear energy development has become more rational, nuclear energy as a clean, safe, large-scale alternative forms of energy can still meet energy needs in many countries, energy security, climate change, alleviate pressure on resources and the environment an important choice. Japan's Fukushima nuclear accident, the Chinese government actively respond on the basis of a comprehensive assessment and reiterated unswervingly adhere to the development of nuclear energy policy,bridge gantry crane the current construction of nuclear power has steadily returned to normal. China currently has 17 nuclear reactors in commercial operation, with a total installed capacity of 14.7 million kilowatts, nuclear power plant under construction 29 units with a total installed capacity of 30.57 million kilowatts, China has become the focus of one of the world's nuclear power development. With China's implementation of the policy of energy saving and long-term nuclear power development plan and the implementation of nuclear power in China's energy structure will occupy more market share. Construction machinery industry as the direct beneficiaries will be in stock and opportunities for further development,eot crane in particular the application of large-scale machinery products will be greatly boosted.

2013年8月27日星期二

Development of domestic crane

  The rapid development of modern science and technology to promote the modern design and manufacturing capabilities, the fierce market competition is increasingly reflected in technology competition , which prompted the overhead gantry crane  machinery products technical performance into a new phase , lifting machinery is experiencing a huge technological change. Some industry leading enterprises in the introduction , digestion and absorption of advanced industrial countries on the basis of similar products , keeping up with international trends, the introduction of new theories, new technologies, new methods to promote optimal design , CAD / CAE and other modern design methods, products are also to the automatic , intelligent and information sent tuxedo, to complete , systematic and large-scale development ,bridge gantry crane to large , efficient and energy-saving technology development , product diversification, the development of special cranes to meet the requirements, design to scale, general development, and starting to focus on product interpersonal rationality, shape, surface coating such as the appearance of quality , help to improve operational efficiency and safe operation.
      An improved lifting dissipation , reduce weight
       Cranes and more domestic computer optimized design has been adopted , in order to improve the machine's technical performance and reduce weight , and in this context as far as possible the new structure . If 5 ~ 50t overhead  eot crane  sed in semi- generic off-track main beam structure, compared with the track box girder can be reduced or eliminated in the small girder stiffened panels , plus canceled short plate board, reduce structural weight , saving processing . National Spark Program had split with four proposed bridge is not high structure , together with the ordinary racetrack in the same bridge crane lifting height , the plant can be reduced corbel elevation 1.5m: two ends of the main beam is placed end of the beam, with the bolt connection: wheel tread height drop as a result , will make the plant corbels elevation drop. In the role of the vertical wheel load , the calculation of the column height, factories and infrastructure cost reduction , plant life increases.
      2 , the full absorption of foreign advanced technology .
         Are:
        ( A ) the size of the crane car run institutions a "triple play " drives, hanging on the end of the beam inside it from the main beam deflection and vibration under the influence of improved operational performance and life institutions , and to compact, beautiful appearance , easy installation and maintenance .
        ( 2 ) With halogen machining capabilities within the overall frame carts and small bore possible. Thus 45 ° mesh and wheels or cylindrical bearing box will replace the angular bearing housing , the shaft mounted on the wheel axle beam centerline axis of the hole and the end of votes constituting 90 °, so the horizontal and vertical deflection of the wheels Phan can be strictly controlled within the specified country , the occurrence of the phenomenon of eating track . The frame is a small bore formed after welding , hole center line of the four wheels in the same plane , three landing successfully solved the problem .
        ( 3 ) Lifting mechanism used in the hardened or hardened reducer , gear accuracy of 7 , the tooth surface hardness 320HBS, thus increasing the carrying capacity , extended service life.
        ( 4 ) electrical control, digestion and absorption of foreign advanced technology, using a novel energy-saving speed control system . If thyristor cascade open or closed loop systems, speed ratio up to 1:30. With the increasing demand for speed , frequency modulation with Dingmen cranes require frequency control system, microcomputer automatic correction country has a large head and precision microcomputer monitoring system.
        ( 5 ) Remote crane development needs to be as production volume is also growing , Baoshan steel mill cranes in the study abroad after the proposed remote crane develop recommendations to improve safety, reduce labor .
     3 , to large-scale development
         Since the state 's emphasis on energy and funding the construction of many large and medium hydropower turbines is growing. Special Chang Three Gorges Project construction on a large crane requirements rapidly. Three Gorges Project main plant installed two 1200/125t  hoist gantry crane, equipped with a 2000t in type tower crane . With the current national policy of stimulating domestic demand, the gradual introduction , there are many large-scale hydropower , nuclear power plants and large and medium-sized power plants need to build , can be expected in high -tonnage cranes requirement is very large and broad prospects.

Overhead crane safety inspection

In order to ensure the safe operation of  overhead gantry crane  , the crane operation required during some routine security check items and points are as follows:
 
 1, lifting height limiter, travel limit switch and the interlock mechanism normal performance, safety and reliability.

 2, the main components meet the safety requirements: opening increases less than 15% of the original size, torsional deformation of less than 10%; plate hook bushing wear less than 50% of the original size, plate hook spindle wear less than 5%, no peeling, burrs, welding. Hanger hook and pulley no obvious defects. The surface of the wire rope wear, corrosion is less than 40% of the diameter of the wire, broken wire in a twisting pitch of less than 10% of the total number of wires, no breakage, no thinning,eot crane no core prolapse, dead twisting, extrusion , annealing, burning phenomenon. Rope end connections and fixed clamp, plate, wedge block connection intact, no loose, plate no less than two, no less than three clips. Roll no cracks, connections, fixed no loose; cylinder wall wear less than 20% of the original thickness; secure volume of not less than two laps, drum and rope diameter ratio meets the requirements. Balance wheel fixed intact, wire rope shall conform to the requirements. Brakes no cracks, no loose, no serious wear, brake clearance is equal on both sides of the right size, there is sufficient braking force, brake band wear less than 50% of the original thickness.
 
      Through the  bridge gantry crane  safety routine inspection, to prevent accidents, reduce equipment accidents, improve equipment operation rate, lower maintenance costs etc. played a significant role.

Precautions checking crane components


1, hook: Check marks and  eot crane  hook retaining device meets the requirements, hook cracks, delamination and other defects; hook wear section, the opening degree of the increase in the amount of torsional deformation is exceeded; hook neck department and whether the surface fatigue deformation, cracks and associated pin, sleeve wear.
2, wire rope: Check the wire rope specifications, models and matching reel pulley meets the design requirements. Rope fixed end plate, Shengka, wedge blocks, etc. rope fixtures meet the requirements. Rope wear, broken wires, kinking, flattening, bending, off shares, corrosion, etc. are exceeded.
3, brakes: brake settings,overhead gantry crane brake type meets the design requirements, the brake lever, the spring without fatigue deformation, cracks and other defects; pins, spindles, brake wheel, brake linings for wear exceeded, hydraulic brake oil leaks; brake gap adjustment, braking capacity can meet the requirements.
4, reel: reel body, tube edge without fatigue cracks, damage, etc.; rope groove and the cylinder wall wear is excessive; drum flange height and rope winding layers can match; guide rope, rope Operating with compliance requirements;
5, pulleys: Is there a retaining rope pulley groove means; pulley rope groove, rim cracks, broken edges, such as excessive wear, pulley rotation is flexible.
6, Gearhead: Gearhead machine is running without intense metal friction sound, vibration, radiation and other unusual sound shell;bridge gantry crane shaft is sealed intact, loose bolts and other conditions have defects; gear lubricant selection, the oil surface height, vertical reducer oil pump is running, open gear lubrication compliance.
7, the wheel: the wheel tread, axle whether fatigue crack phenomenon axle wheel tread wear is excessive. Are there eating track running phenomenon. Caused by gnawing track what is the reason.

2013年8月26日星期一

Appeared eight kinds of circumstances to be re-tested construction crane

Recently, Dongguan City building housing the Bureau issued "on the strengthening construction crane safety supervision and management of the notice", requiring all construction  overhead gantry crane  property unit to the unit immediately construction crane to conduct a thorough examination, a national command eliminate or prohibit use more than the prescribed useful life or not up to the technical standards for safety and must be scrapped, in addition to the "Notice" also appear explicitly eight kinds of situations, you must re-inspection.

In addition, the City building housing the Bureau request the construction units to strengthen management of construction crane inspection, appeared eight kinds of circumstances construction  eot crane ,  and use the appropriate qualifications to be entrusted with the inspection agencies to re-inspection, after passing be put into use. These eight scenarios include: on-site installation to achieve maximum independence height; inspection period from the last full year when; downtime idle time full 90 days to regain use; through modification or overhaul; natural disaster or a security accidents, may make structures or institutions, and security guards suffered damage and so on.

In addition, the Municipal Housing Board also requested towns Street (Park) Planning and Construction Office (Bureau), safety supervision agencies in the supervision and inspection found construction crane there may not rent, use or should be scrapped, to the original authority for filing cancellation formalities, should be immediately ordered to stop illegal activities related units,bridge gantry crane in strict accordance with the provisions implementing misconduct offense, and shall be brought to the Urban Construction Bureau for administrative penalties.

Endless crane accidents

Hanging on the door in the workshop electric crane, was "three noes" products, and the side of the simple three-manned cargo lifts, but also secretly assembled. This is the recent Taiwan City, Zhejiang Province, quality supervision departments, Union Electric Co.,eot crane Ltd. Hao lifting conducted surprise checks to see the situation, which found a lot of security risks. According to Zhejiang Provincial statistics, last year, the province's machinery and electronic special equipment fatalities 8, of which fixed Easy lift accident six, the death of six people, accounting for electromechanical special equipment accidents 75%.

Nearly four years of accident data show that: the type of crane accidents, mainly in fixed simple lift bridge (the door) cranes, harbor, overhead gantry cranes (quay cranes) and other categories, together accounted for crane accident about 80%. Among them, the fixed simple lift accident particularly obvious, and occurs mainly in small and medium sized private economy gathered Wenzhou, Taizhou, Jinhua and other regions.hoist gantry crane The management system of confusion, there are security risks as well as the device illegal operation, is caused by lifting the primary cause of the accident.

In recent years, with the sustained and rapid economic development, increasing the number of Zhejiang lifting machinery. Some legal units and enterprises as safety consciousness, lifting machinery and undocumented counterfeit manufacturing, installation and use of technical specifications do not meet safety requirements and other issues are very prominent.

These are just happen Zhejiang Province, the relevant responsible person said, lifting machinery production and life as a social indispensable production equipment, has been widely used in various fields of economic construction. Meanwhile, the lifting machinery in the course also has a larger risk. It is understood that in 2006 the national total of 299 casualties from special equipment,hoist crane lifting machinery accident had 133 cases, accounting for 44.5% of total number of accidents.

2013年8月25日星期日

Moving to one hundred tons of cranes to large-scale development


In what is now on the eot crane  industry for large-scale development which already can not possibly avoid. In the limit of our many products appear, along with the present society in constant development today, along with engineering and project expansion can know that, for large tonnage machinery demand began to slowly increase. 16 tons above products are larger increase. Many car companies have to crane production ace tonnage of more than 100 products forward. This bodes ill, large-tonnage truck crane has long been the monopoly of foreign enterprises have broken. Country for the development of large-scale machinery began to slowly grasp the core technology, beginning with their own independent development of large cranes, avoiding the foreign market monopoly of production.

In the current mechanical level to know, for some walking in the street car's mechanical equipment of many flexible shuttling between the various sites and emergency scene, as these mobile construction machinery new family a relatively truck crane development early, auto  bridge gantry crane  which have a certain role in the car while still inherit flexible and can rely on the power unit of the car itself, does not require additional power source; may need transvestites grabs, trenching and other components, to achieve a multi-purpose vehicle . Environment in more different degrees by the users of all ages. Such ability to have both a lifting crane performance car, which is driven by a device without a crane has been brought to the development of a stable system market.

In With the development of China's economy can know the demand for large tonnage, China's want their occupying a large tonnage market still has some difficulties, the technology is still in China now is an immature stage, In most of the machinery is an imitation of the stage in the more technical level there are still some distance. While for the crane is a need for more better designed equipment to support the crane, one of the research for the car crane technology and more on the international level is still an overhang poor.

Meanwhile, the market now foreign large-tonnage truck crane, machine manufacturing has been achieved computerization and automation. From production to full replacement of modular units, through targeted replacement NA module, so that the upgrading of products much faster. The more intelligent technology era. Using more advanced technology, the requirement for more precise mechanical and precision. In the current update for more eco-friendly materials appear, for the future development of the  overhead gantry crane  is also an influence on the direction of development. Faced with this problem of China's enterprises should continue to see their progressive development of strength, to grow in the dark. Developed with independent intellectual property rights, establish their own brand image. The only way to be more proactive in the competition, sustained increase in corporate activity.

2013年8月23日星期五

Oversupply of large-tonnage cranes

    Crane industry manufacturers and lessors are aware, just get drawn to meet international standards, and others do not have large-tonnage cranes, in competition with competitors can certainly shoo,overhead gantry crane the rewards are good.

Evolving modular construction techniques to help the crane industry completed a previously impossible feat to accomplish, such as Hunan Changsha at the end only 15 days to build a 30-story building T30. Although some people questioned the safety of the building, but the building does represent the completion of the current level of development of modular construction techniques, it also shows that a larger size of prefabricated modular building is a trend. This large crane manufacturer is a good news.

Around the world, building refineries and power plants, from the weight of more than 2000t crane can save large sums of money, and its enormous lifting torque can cover a large area on the site,eot crane even in the most crowded sites, can also be easily will include lifting over obstacles.

However, now that someone has noticed, with the super-heavy cranes capable of producing more and more companies and emerging market countries, works to large-scale use of this specification cranes,bridge gantry crane crane likely that sooner or later will lead to oversupply phenomenon.

2013年8月22日星期四

State regulation lifting construction of national key construction projects

Production Safety Commission Office of the State Council recently issued a circular that is focused on solving the construction cranes, scaffolding collapse accident-prone, frequent problems, eot crane effectively prevent and resolutely curb serious accidents, decided this year to April to December, in the construction areas of prevention construction cranes, scaffolding collapse special rectification work.
    An commissioned issued special rectification program that focuses on the special rectification are: housing and public works, industry, railways, highways, electricity (including nuclear power) and water (including the South) and other construction projects, especially national key construction projects, the provincial key investment and development projects, and real estate development projects, affordable housing and urban rail transit construction and other projects.
    Notice that the special rectification of the key elements include: Construction Project site uses various types of lifting machinery, including gantry cranes, bridge machines, bridge crane especially the tower crane collapsed, falling accident, as well as tower crane installation, demolition process in a variety of hazards and accidents; construction projects and construction sites on which various types of scaffolding, especially stents, scaffolding support system collapse, including any pipe material, the use of various types of templates triggered collapse.
    The circular emphasizes that the main responsibility to implement the enterprise, strengthen construction safety supervision and management; regulate the construction market order, crack down on illegal construction violations, to crack down on qualifications beyond the scope of contract works, construction companies no relevant qualification certificates, illegal subcontracting, subcontracting and other illegal activities; strengthen grass-roots infrastructure, enhance security capabilities construction; strengthen the construction site management, improve the level of safety in production of construction enterprises; strengthen scientific and technological support, and actively promote the construction of advanced and applicable technologies.
    The circular pointed out, through special training to effectively prevent the construction field construction cranes, scaffolding collapse, further reducing the total accidents, efforts to achieve year 2012 construction field construction cranes, scaffolding collapse the number of accidents and deaths up decreased,hoist crane a larger decline in the number of accidents is not less than 3.2% of the target, to prevent the occurrence of major accidents.
    Notification requirements, from May to September this year to carry out self-examination and self-correction, October to mid-November on the key areas, key enterprises and key projects to conduct random checks.

Future container cranes container throughput rose steady demand

As the rapid growth of international trade and the gradual increase in the rate of containerization, the global container throughput in 2000 from 200 million TEU to 2011 TEU over 500 million,eot crane an average annual compound growth rate of 12%; Meanwhile, the domestic port container throughput from 20 million to 164 million TEU TEU, an average annual compound growth rate of nearly 30%. Affected by the financial crisis, in 2009 the domestic port container throughput fell by 6% growth in 2010 and 2011 to 18.85% recovery, 11%.jib crane From the port distribution point of view, in 2005 after Inland port container throughput growth of more than 20 percent, faster than the coastal port container throughput.
The next few years, the global container throughput compound annual growth of 8%; taking into account the needs and update new demand is expected to average demand quayside 500, RTG 1000 units. According to "Container Handling Equipment Industry Report," the statistics, China is expected to scale coastal port container throughput in 2020 plan year 2010 actual throughput growth of 190% to 340%, mainly inland port container throughput in 2020 plan year 2010 actual throughput increase of 150% to 1000% "Twelve Five" period, China and quay  gantry crane  tracks the total market capacity will exceed 1,200 units and 800 units.

2013年8月21日星期三

Lubrication and leak-proof cranes

1 crane lubrication basic requirements
Crane lubrication routine maintenance work is an important aspect of the quality of lubrication not only directly affect the functioning of the institutions and mechanical life, but also affect the safety in production and productivity. Therefore, operators and maintenance personnel must always check the  eot crane  lubrication of lubrication points, time to supplement and replace the lubricant.

Lubrication should follow the principle: whenever a shaft and hole moving with the place, as well as the mechanical part of the friction surface, must be lubricated regularly. Since the conditions of use cranes (utilization rate and the use of the environment, etc.) is different for different parts of the lubrication should be based on a proper understanding of the specific circumstances.

A) the way the crane lubrication
Lubrication  jib crane  bodies into decentralized and centralized lubrication lubrication.

Small cranes generally use distributed lubrication. Lubrication or oil cup oil gun used for grease lubrication points respectively. Scattered lubrication advantages are: simple structure, reliable lubrication, easy maintenance, easy to purchase used lubricating tools, specifications, and low cost. Disadvantages are: lubrication point spread, add oil when you take some time, outside dew point and more susceptible to dust covered or blockage.

Large lifting cranes, special  Steel crane   metallurgical use more centralized lubrication. Centralized lubrication of hand pumps and electric pumps centralized refueling refueling two kinds. Quantitative lubrication Centralized lubrication can be timed from a local concentration of supply multiple lubrication points, can reduce the maintenance workload, improve safety and environmental hygiene. Disadvantage is that the structure is complicated and costly.

2013年8月20日星期二

Decades of continuous development of the scale of construction crane industry

Works in the field of construction machinery  Steel crane  industry maintained a rapid pace of development, the performance of the product gradually cover the upgrading, technological innovation and product technology content increased, leading enterprises continued strength and so on.
The accelerating pace of international development: international and domestic brands competing against the phenomenon of corporate mergers and re-evident, sole proprietorship, joint venture, joint stock company and other economic forms coexist economy to the crane industry has brought new vitality and challenges.
Manufacturers and products quickly escalated: the production and new products as a symbol gradually strengthened. All-terrain eot crane  and crawler cranes constantly refresh the tonnage records, business investment to expand manufacturing capacity has been increasing, a large construction crane development trend more apparent.
Product market sales continue to grow year after year: the market size is growing, international and domestic demand continues to increase in all regions. Crawler cranes rely on imports of basic reversing the situation, the strong growth momentum all terrain crane, lorry crane market is broad space for development.
10 years, construction cranes product sales year after year, the market is expanding, non-automotive  bridge crane  strong growth momentum, China's construction crane market with outstanding performance attracted worldwide attention.