Gantry crane is a variant of Bridge crane. In the port, mainly for outdoor yard, yard goods, bulk cargo loading and unloading operations. Its metal structure shaped like a door frame, bearing girder installed under two feet directly in the ground walking on the tracks, you can have both ends of the main beam overhanging cantilever.
2013年12月12日星期四
Wire rope electric hoist
Wire rope electric hoist by building height, such as rail type is divided into 14 types. Code types of HSG standard building height, linear rail, rigid bridge gantry crane table code class type of hand trolley type HSJ standard building height, type curve track, hand trolley type HLG hinged connection standard building height, linear rail, rigid connection of sprocket trolley type HLJ standard building height, the curve of orbit, hinged connection of sprocket car type HDG high overhead gantry crane building. Electric hoist can be used as a heavy equipment used alone, a small driving after also can be used for overhead monorail crane. Is a kind of compact structure, light weight, high efficiency and easy operations of lifting equipment. Specifications of wire rope electric hoist by building height, track type can be divided into 14 types. Choose type HLJ its appearance figure, symbol and type, the performance of electric hoist wire rope electric hoist code and type code type HSG standard building height, linear rail, rigid connection of hand trolley..
2013年12月11日星期三
The tension flange of crane beam
The tension flange of crane beam (or crane extension of tension chord)
shall not be welded on the hanging equipment parts, and should not be on
the spot at the lighter or welding jig. According to the provisions of
the deceleration condition, bridge gantry crane properly selected base of the
natural logarithm of multi rope friction wheel lifting equipment, the
article conforms to the rated load of the pull wire rope with the
friction between the friction wheel pad, raising and lowering design
load in working braking coefficient; Force braking. Because in the
process of lifting overhead gantry crane work not a - round Angle, degree; To appear
empty container operation, in this condition, the rope dynamic antiskid
safety factor; Such as emergency braking, according to hoisting rope
sliding conditions not allowed by the raise the most unfavorable
condition or than in accord with the rated load under the condition of
raising and lowering a load side wire rope with light load side the
cargo when the brake is more bad. Must, in accordance with big static
tension ratio, therefore, the operating conditions for determining
dynamic system of lifting equipment to work k - double container hollow
container runtime allow dynamic boundary conditions. In addition, the
balance weight single container to xu line, reduce the rope dynamic
antiskid safety equipment, also according to the conditions on the
difference of the counterbalance weight coefficient.
2013年12月9日星期一
tasks furthest apart are given priority as initial tasks
These initial tasks are assigned respectively to different (crane) task groups
as the first member of the group, then all other tasks are clustered according to proximity to them. Obviously, tasks furthest apart are given priority as initial
tasks. When multiple choices exist, overhead gantry crane running time can be reduced by selecting tasks with smaller feasible areas as initial tasks. The model provides
assistance in this respect by displaying graphical layout of tasks and a list of
the size of feasible area for each. After assigning an initial task to a group, the model searches for the closest remaining task by checking the size of overlapping area, then bridge gantry crane it into the task group to produce a new feasible
area corresponding to shape and size of feasible areas, illustrated in Fig. 9. In this case study, from the data and graphic output, the user may become aware that optimal locations led by test sets 1, 2, and 3(Fig. 3) are the best choices (balanced workload, conflict possibility, and efficient operation). Alternatively, in connection with site conditions such as availability of space for the crane position and ground conditions for the foundation,
as the first member of the group, then all other tasks are clustered according to proximity to them. Obviously, tasks furthest apart are given priority as initial
tasks. When multiple choices exist, overhead gantry crane running time can be reduced by selecting tasks with smaller feasible areas as initial tasks. The model provides
assistance in this respect by displaying graphical layout of tasks and a list of
the size of feasible area for each. After assigning an initial task to a group, the model searches for the closest remaining task by checking the size of overlapping area, then bridge gantry crane it into the task group to produce a new feasible
area corresponding to shape and size of feasible areas, illustrated in Fig. 9. In this case study, from the data and graphic output, the user may become aware that optimal locations led by test sets 1, 2, and 3(Fig. 3) are the best choices (balanced workload, conflict possibility, and efficient operation). Alternatively, in connection with site conditions such as availability of space for the crane position and ground conditions for the foundation,
2013年12月5日星期四
Crane (crane) operation normally just four driving and driven wheels
Crane (crane) operation normally just four driving and driven wheels, if
the weight is very big, bridge gantry crane used to increase the wheel round ways
to reduce pressure. When the wheels for more than four, must adopt
balanced articulated frame device, make the crane load evenly
distributed on each wheel. Bridge of the metal structure is composed of
main girder and end beam, divided into the single main girder bridge and
double beam bridge two kinds. Single main girder bridge by single
girder and in the end on both sides of the span of beam, double girder
frame is overhead gantry crane of two main girder and end beam. Main girder and end
beam, rigid connection on both ends of the beam is equipped with wheels,
to support bridge run on overhead. Main girder welding on the track,
for lifting the car running. The structure of the bridge girder type is
more than the typical box structure, four truss structure and vierendeel
truss structure. Box structure and can be divided into the right box
double beam, partial rail box double beam, partial rail box girder to
wait for a few kinds. On track box double beam is widely used in a basic
form, main girder by on either side of the upper and lower flange plate
and the vertical web, rail car arrangement in the center of the line on
the flange, its simple structure, easy fabrication, suitable for batch
production, but gravity is bigger. Partial rail box double beam and rail
box single girder cross section are ranged from upper and lower flange
plate and the thickness of the deputy of web, rail car is decorated in
the main web above, the casing short stiffening plate could save, in
which partial rail box single main box girder is composed of a wide
flange instead of two main girder, the weight is small, but made more
complex. Four by four pieces of plane truss girder structure combination
into a closed space structure, on the surface level on the truss
generally covered by bedplate, weight light, stiffness big, but compared
with other structures, appearance size, made more complex, the fatigue
strength is low, have less production. Vierendeel truss structure
similar to partial rail box girders, is composed of four pieces of steel
structure of a closed, in addition to the main web for solid abdomen
i-section girder, the other three piece of sheet metal in accordance
with the design requirements of cutting into many window, form a
vierendeel truss without diagonal, in the upper and lower levels of
truss surface covered by bedplate, crane running mechanism and
electrical equipment installed inside the bridge, weight is lighter, the
overall stiffness is large, it is more widely used in China a type.
General bridge crane mainly driven by electricity, generally is in the
driver indoor manipulation, also has a remote control. Lifting weight of
up to five hundred tons, the span of 60 meters. Simple beam bridge
crane, also known as crane beam, its structure is similar to ordinary
bridge crane, lifting weight, span and working speed are smaller. Bridge
girder is composed of steel and plate steel beams or other simple beam,
with chain or electric hoist with simple and easy as lifting trolley
car, the car at the bottom flange of the h beam. Can bridge along the
orbit, on a high shelf can also be along the suspension in elevated the
orbit, below this kind of crane is called suspension girder crane.
Special metallurgy bridge crane in the process of iron and steel
production may take part in the process of the specific operation, the
basic structure similar to ordinary bridge crane, but also on lifting
the car is equipped with special working mechanism or device. The
working characteristics of this kind of crane is used frequently,
conditions, job level is higher.
2013年12月1日星期日
According to the bridge approach is divided into bearing type and suspension type two kinds
According to the bridge approach is divided into bearing type and suspension type two kinds. The former bridge along the car on the beam of crane orbit; The bridge along the hanging in the workshop crane orbit under the roof. Single girder overhead gantry crane crane, electric two break up. Manual single-beam bridge crane institutions working speed is low, the weight is small, but its quality is small, easy to organize production, low cost, suitable for no power after carrying amount is not big, requirements for speed eot craneproductivity is not high. Manual single-beam bridge crane using manual monorailey troll as a running car, with the hand chain hoist as lifting mechanism, the bridge is made up of main girder and end beam. Main girder with single beams, beam with steel or bending molding steel plate welded.
2013年11月29日星期五
Loader shovel dug and loading and unloading material is implemented through the movement of the working device
Loader shovel dug and loading and unloading material is implemented
through the movement of the working device. By the typical working
equipment of loader bucket, movable arm, connecting rod, rocker arm, and
turned the bucket steel crane, movable arm oil cylinder,hoist gantry crane. The whole
device is hinged on the frame. Bucket bucket cylinder through the
connecting rod and rocker arm and articulated, for loading and unloading
of materials. Movable arm with frame, movable arm cylinder hinged, used
to hoist bucket.
2013年9月8日星期日
Manual single girder suspension crane what role?
With the market for its increasing emphasis on the development of the machinery industry, for machinery production operations are also getting support, in order to better reflect the effect of the operation of machinery and equipment, already on the market developed more products, each product is new machinery and equipment products are designed to be able to make a better mechanical equipment operating personnel to assist them so that their work can also reduce the burden, so that manual single girder suspension
hoist crane is better , then it is mainly what role?
1 speed
Today on manual single girder suspension crane operation speed of the process is relatively fast, on this point who used such products people are such a kind of feedback, indicating that the current manual single girder suspension overhead bridge crane is better quality , and has an excellent performance, which is more satisfactory place, so in the course of its operation is often the faster, the faster the product is the more promising, so that it is are more useful.
2 Simple operation
Today in the market manual single girder suspension crane is a mechanical device more popular products, because when the operator when used in its feeling is very simple, because it is relatively simple to operate, there is nothing complex functions , not too professional, most people will use it.
This is the manual single girder suspension bridge gantry crane in the market, the role played.
1 speed
Today on manual single girder suspension crane operation speed of the process is relatively fast, on this point who used such products people are such a kind of feedback, indicating that the current manual single girder suspension overhead bridge crane is better quality , and has an excellent performance, which is more satisfactory place, so in the course of its operation is often the faster, the faster the product is the more promising, so that it is are more useful.
2 Simple operation
Today in the market manual single girder suspension crane is a mechanical device more popular products, because when the operator when used in its feeling is very simple, because it is relatively simple to operate, there is nothing complex functions , not too professional, most people will use it.
This is the manual single girder suspension bridge gantry crane in the market, the role played.